← All tags

Tag: ArtemisIII

8 briefs tagged “ArtemisIII”.

Daily Brief

NASA's Artemis III team details SLS and Blue Moon plans as Swift nears reentry and Leidos protests a NORAD contract

At a Huntsville symposium, NASA and industry leads said SLS will fly Artemis III without its upper stage, with a pad tanking test targeted by year-end, while Blue Origin expects to restart its New Glenn pad in December. Swift is due to reenter Nov. 4, SpaceX's USSF-432 Falcon 9 launch now shows Nov. 6, and Leidos has protested the $572 million Cheyenne Mountain support award to Amentum. Golden Dome had no new milestone, and its funding still hinges on a stalled reconciliation bill.

Daily Brief

NASA won't commit SLS for Artemis III until Blue Moon is in orbit, as Google eyes a Golden Dome data role

Administrator Jared Isaacman told NASASpaceFlight that Artemis III will not commit the crewed SLS launch until Blue Origin's Blue Moon test lander is in orbit and checked out, naming the lander as the schedule driver. NASA opened a commercial-servicing RFI for Hubble, Swift reenters this week, and Starship Flight 15 still awaits its FAA license. Bloomberg reports Google is in early talks on a Golden Dome data-security group, and State cleared a $2.1 billion, 500-interceptor PAC-3 MSE sale to Ukraine paid for by allies.

Daily Brief

NASA eyes June for Artemis III as the Army picks Lockheed's PAC-3 Edge for its Future Interceptor

Aviation Week reports NASA is aiming to launch the third SLS in June 2027, and Blue Origin expects to finish welding the Blue Moon Mk2 test article's hull by January. Starship Flight 15 moved to Nov. 12 on FAA planning data. The Army awarded Lockheed Martin a $1.08 billion Future Interceptor agreement for PAC-3 Edge, while Golden Dome waits on the Dec. 11 funding deadline.

Daily Brief

NASA lays out the Artemis III flight plan and reroutes both Moon landers; Golden Dome's funding clock runs toward Dec. 11

At Friday's briefing NASA held Artemis III to summer 2027 and published a 14-day Earth-orbit plan to dock Orion with Blue Origin's and SpaceX's landers, dropped the halo-orbit rendezvous for both Artemis IV-era landers, and said it is working with ULA on an extended Centaur V to put Orion in low lunar orbit. Golden Dome still has no fiscal 2027 money, and the Space Force moved its first Next-Gen OPIR missile-warning satellite from Vulcan to Falcon Heavy.

Daily Brief

NASA sets a Friday Artemis update as an Army interceptor warning and a Russian satellite's pursuit of ICEYE raise the stakes

NASA leadership briefs Oct. 23 on Artemis III and the 2028 landing goal, after Administrator Isaacman said Kennedy has cut its stacking schedule in half. JAXA's MMX launches today with NASA instruments and a Blue Origin-built sampler, and Blue Origin announced a $330 million New Glenn expansion. On missile defense, CBS reports the Army chief warned before the Iran war that THAAD and Patriot stocks would stay strategically low until 2030. Russia's Cosmos 2612 has also closed on ICEYE-X36, a U.S.-registered radar satellite tied to Ukraine.

Daily Brief

NASA sets Oct. 23 Artemis Acceleration briefing as Golden Dome stands up cyber defense

NASA will brief on Oct. 23 on accelerating Artemis: Artemis III is now a 2027 low-Earth-orbit test of commercial lander systems with SpaceX and Blue Origin, and the first crewed lunar landing is targeted for Artemis IV in 2028. A SpaceX cargo Dragon on CRS-35 is due to dock at the station this morning with the final roll-out solar arrays. At AUSA, NORTHCOM's Joint Task Force-Gold said defensive cyber for Golden Dome is a new mission set, with an initial capability targeted by year-end.

Breaking

Artemis III's rocket is taking shape: SLS boosters stacked, all four engines on the core stage

NASA says both SLS solid rocket boosters are fully stacked on the mobile launcher inside the Vehicle Assembly Building and all four RS-25 engines are installed on the Artemis III core stage. Next comes a "short stack" rollout to Pad 39B for a tanking test and a crew launch-day rehearsal, while Marshall in Huntsville has finished welding the Artemis III spacer.

Daily Brief

From Space Command rivals to Golden Dome teammates: Huntsville and Colorado Springs join forces as Artemis III watches its landers

More than 90 Colorado Springs leaders are in Huntsville this week, and SPACECOM's Gen. Stephen Whiting used Monday's joint event to back a new "twin-city partnership" on missile warning, tracking, command and control, and interceptors as the HQ move to Redstone Arsenal keeps building. Meanwhile, an Artemis III astronaut says the 2027 mission is on track "but anything can happen," and Golden Dome starts FY27 with no usable funding.